Sunday, February 13, 2011

Week 75: Almost There




The highly antipicated concrete shower pans went in this week, it looks great! Took some engineering and ice columns that Matt devised. Should have filmed the process. Medicine cabinets were finished by the expert woodworker friend of Matt. It looks fantastic. this whole thing looks much better than we could have envisioned. The Blu Dot Mirror Mirrors turned out to be a great find at 50% off especially. The metal components surrounding the mirror was a perfect base for hinges of the LVM. It's a little heavy, so Matt is going to put extra enforcements.
With these 2 components in place, we are all set for balance of tiling. Only 15 days until the Building permit expires, let's hope that we do not need to apply for another extension.
We passed the BOH Septic this week, in the middle of the huge pile of snow. That was a relief!