Saturday, February 19, 2011

Week 76: Kitchen Dreams




The kitchen ceasarestone counter tops finally went in this week. Our Kitchen dreams have come true. The Pure White color looks incredible against the concrete. We showed the pictures today to Barry and Victor (the installer) from Europe Kitchen Center. They were so impressed with how it finally turned out. It's exactly as we imagine it would be. The flow from window sill to back splash is seamless. The only minor issues were the radius of the sink corners and the grout color. Barry is going to see if they can work on the sink corner to get it sharper, but ceasarestone has guarantee only for upto a minimum radius, we can't have the sharp straight corner that we want. Also the grout color is standard optical white, versus the bluish white of the counters, we're hoping over time, the grout will blend in more.
The island had to be moved few inches due to the misalignment with the range hood, unfortunately during the moving, the oven became off level. Victor promised to stop by to check on correcting it sometime.

Sunday, February 13, 2011

Week 75: Almost There




The highly antipicated concrete shower pans went in this week, it looks great! Took some engineering and ice columns that Matt devised. Should have filmed the process. Medicine cabinets were finished by the expert woodworker friend of Matt. It looks fantastic. this whole thing looks much better than we could have envisioned. The Blu Dot Mirror Mirrors turned out to be a great find at 50% off especially. The metal components surrounding the mirror was a perfect base for hinges of the LVM. It's a little heavy, so Matt is going to put extra enforcements.
With these 2 components in place, we are all set for balance of tiling. Only 15 days until the Building permit expires, let's hope that we do not need to apply for another extension.
We passed the BOH Septic this week, in the middle of the huge pile of snow. That was a relief!

Monday, February 7, 2011

Week 74: Shower Pan & More Tiles




This week progress was slow again due to snow. Now just 1 week from our original target date of Feb 15th. It doesn't look like we will make the move in date. Our site was completely covered in snow, which makes the house almost disappear in it.
Shower pans were cast out of concrete, this week would be the week we find out if it works. More bathroom tiles went up in the LVM.