Saturday, March 20, 2010

Week 29: Trench and 2nd polishing of floors




This week was the inspection of the erosion control measures we were supposed to put in place. On friday 3/19, the town inspector came along with the main sub division owner. We got the March 23rd court appearance canceled, however, we are still lacking some additional work that needs to be done. I'm not sure what else, but we are supposed to get a letter detailing additional work to be done.
The trench was dug to put in the well water, tel, cable and electrical lines. it's a massive trench about 500 feet long. Bit unbelievable when you think about it.
The floor polisher returned to sand down the floor bit more, now it looks more uniform and you see the veins of the concrete which is quite nice.

No comments: