Sunday, April 3, 2011

Week 82: A Complete Bathroom





The LVL Guest Bathroom was the first to be completed this week. It has a working toilet, so exciting! All the fixtures looks and works wonderful together. Didn't hear of any installation issues about the Grohe Shower System that we had to get from Hong Kong. The temperature display is in Celsius, but it's kind of unique.
Matt and Adam are about 70% done with the LVL Master Bathroom tiling. Glass for the showers are coming in Thursday. We were hoping to get the CO this week, but it looks more likely for the week after next.
After contemplating on ripping down the Ikea closets depth to fit the coat closet and LVL guest bedroom closet, we decided to just go with an Elfa closet system. Bought it from The Container Store and got it delivered the same week. It was a painless installation. Can't believe people pay them to install it. It took less than 1 hour for each closet.
Meanwhile Sliding Doors are also in for the master closet, the tracks provided was a bit larger than the doors, we had to order the 2x4 beam trims to pad the left and right sides. Otherwise it looks great.

No comments: