Saturday, March 13, 2010
Week 27 & 28: Exterior Insulation
Weather has finally started to turn for the better. We enjoyed a week in the 40's and 50's for a change. Matt and Adam had a chance to put in the exterior insulation and get the house wrapped.
The concrete floors are sealed and prepared for final polishing.
We're about to put in the deposit for the windows. Arcadia is having issues with the spec of our front door. We've decided to do an expansive front door running the entire width of the front entrance, which is about 5 feet wide by 7 feet high (we wanted 9 feet originally, but I don't think the engineers are going to go for that). Arcadia refuses to make the front door since they can't guarantee it due to the weight of wide door. Checking with 1 more supplier before we give up.