Week 46 & 47: Framing & Farming





Some interior walls have gone up this week, the Utility Room, LVL Guest Bathroom, LVL master toilet room and closet. Getting a feeling for the overall space already. Once the walls go up, everything actually starts to feel bigger.
We've also put in coaxial, ethernet wiring which took 1 entire day of Han's intensive hole drilling labor. Minus a small injury on his shin, everything came out well. Note to self, get a first aid kit.
Other fruits of our labor: Our water melon and squash is doing very well, we're most likely going to harvest the few fruits next week.

Saturday, July 10, 2010

Week 44 & 45: Windows!!!!




We have windows, massive ones. They said it was too heavy, too big, but we prevailed with the design. It's beautiful and gigantic. Sticking to our guts was definitely the right thing to do. They did cost a pretty penny, but worth every single cent.
We also finished Speaker wiring on July 4th. It was the hottest day of the year so far, we both had stomach virus, but nevertheless, it was done...nothing is going to stop us.

Sunday, June 27, 2010

Week: 43 Frames & Harvest




Exciting week! The Windows were ready. The frames are in!! Looking at the window with the frame truly defines the scale and size of the design & layout.
On another note, the first batch of potatoes are done.
We also laid out the entire electrical lighting layout for the electrician, this will help us save time and hopefully that translates to less money.
Next week, home audio wiring!

Sunday, June 20, 2010

Week: 39, 40, 41, 42 Potatoe Harvest & a new electrician




Weeks have gone by quickly as more siding goes up. We found a new electrician to start where Frank had left off. We've sent a few letters to Frank hoping to get a reply, however nothing had come of it. Steve the new electrician is not officially licensed, however had years of field experience, so it should be ok.
We've harvested the first few potato plants that flowered. The plant was still in the early stage of development, so the harvest was small.
The concrete on the courtyard is finally done, it looks great and feels luxurious.
We have to decide if we should keep the courtyard siding as corrugated or change it to wood slats.
We've already changed the front of the entrance to wood slats, the extra costs are starting to add up.

Monday, May 24, 2010

Week 36, 37, 38 : More Siding and a small potato farm



Additional siding has gone up these few weeks. Meanwhile our missing electrician has finally appeared on the video finishing some exterior lighting work. However none of us can reach him via phone, email or mail. It's getting really worrisome as he's a very good electrician and we would ideally like to keep him on the project.
Our Potato farm is coming along. We also planted watermelon, carrots and beets.

Sunday, May 2, 2010

Week 35: Some squatters




More siding was put up this week. The front facade is almost done.
We found some unwelcome squatters in our master bedroom. Three birds nest and a wasp hive in the early stages of building.

Saturday, April 24, 2010

Week 33 and 34 : More Siding / looking like a real home



These 2 weeks have been exciting, more siding has gone up and the feeling is more like a home. The corrugated part looks better than I would imagine. We are glad we went with the white color instead of the aluminum one. Our house is definately the longest LV home combination out there.
On a side note, we are growing some Potatoes on the land for the first time. Last weekend we planted the first batch. To our surprise we found 3 spuds have been dug up. Although whatever small vermin that did it didn't even eat it. Spoiled animals! what's wrong with a juicy potato? In any case, we planted another batch and hopefully that vermin won't come back. We really need a fence around the plantings. The soil is extra hard, too many rocks and weeds, it's hard labor to till the soil.